{"id":260,"date":"2015-09-29T09:47:55","date_gmt":"2015-09-29T09:47:55","guid":{"rendered":"http:\/\/www-test2.ssec.wisc.edu\/aeri\/?page_id=260"},"modified":"2021-07-28T06:00:56","modified_gmt":"2021-07-28T06:00:56","slug":"er-aeri-daily-preventative-maintenance-procedure","status":"publish","type":"page","link":"https:\/\/www.ssec.wisc.edu\/aeri\/kb\/procedures\/maintenance\/er-aeri-daily-preventative-maintenance-procedure\/","title":{"rendered":"ER-AERI Daily Preventative Maintenance Procedure"},"content":{"rendered":"<p class=\"p1\">Instrument: \u00a0 ER-AERI<br \/>\n<span class=\"s1\">Starting Date: <span class=\"Apple-converted-space\">\u00a0 <\/span>1 July 2015<br \/>\n<\/span><span class=\"s1\">Instrument Mentor: <span class=\"Apple-converted-space\">\u00a0 <\/span>Jonathan Gero<br \/>\n<\/span><span class=\"s1\">Facility: <span class=\"Apple-converted-space\">\u00a0 NSA-C1, AMF-M2, AMF-M3<\/span><br \/>\n<\/span><span class=\"s1\">PM Frequency: <span class=\"Apple-converted-space\">\u00a0 <\/span>Daily<\/span><\/p>\n<hr \/>\n<p class=\"p3\"><span class=\"s1\">The following procedure is for performing scheduled daily preventative maintenance on the Extended Range (ER) AERI.<span class=\"Apple-converted-space\">\u00a0 <\/span>All results are recorded on the PM checklist.<\/span><\/p>\n<h3 class=\"p3\"><span class=\"s1\"><b>Physical check of instrument<\/b><\/span><\/h3>\n<p class=\"p4\"><strong><span class=\"s1\">Inspection of front-end enclosure<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Inspect the AERI outdoor front-end enclosure for damage, debris, or precipitation accumulation.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check the the front panel and all hardware pieces are secure.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check for signs of insect or bird activity.<span class=\"Apple-converted-space\">\u00a0 Check for obstructions on the exterior fan\/filter. \u00a0<\/span>Clear any debris or precipitation accumulation.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist Response:\u00a0<\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">No Problems Noted<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Inspection of sky hatch assembly<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Inspect the sky hatch for damage, debris, or precipitation accumulation.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check that the hatch is clear of obstructions and can open freely.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check that the internal rain sensor and external rain sensor are clean and free of damage.<span class=\"Apple-converted-space\">\u00a0 <\/span>Clean sensors with a KimWipe towel and distilled water if necessary.<span class=\"Apple-converted-space\">\u00a0 <\/span>Clear any debris or precipitation accumulation.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist Response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">No Problems Noted<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Sky hatch status<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Observe and record the current hatch position.<span class=\"Apple-converted-space\">\u00a0 <\/span>Ensure the position is correct for current instrument and weather conditions. \u00a0If the hatch is closed and there is no precipitation, clean the blue surface of the rain sensor with water.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist Response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">Open \u2013 No Problems Noted<br \/>\n<\/span><span class=\"s1\">Open \u2013 Problem \u2013 See CM Report<br \/>\n<\/span><span class=\"s1\">Closed \u2013 No Problems Noted<br \/>\n<\/span><span class=\"s1\">Closed \u2013 Problem \u2013 See CM Report<br \/>\n<\/span><span class=\"s1\">Intermediate \u2013 Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Inspection of internal components<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Inspect the AERI indoor back-end for debris.<span class=\"Apple-converted-space\">\u00a0 <\/span>Clear any debris.<span class=\"Apple-converted-space\">\u00a0 <\/span>Inspect the cryocooler assembly.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check that the heat sink fins are clean and clear of debris.<span class=\"Apple-converted-space\">\u00a0 <\/span>Check that the 2 fans are operational; if airflow is reduced, clean the fan assembly.<span class=\"Apple-converted-space\">\u00a0 <\/span>Inspect the connections between the AERI instrument, computer, iBootBar, ethernet switch, and the AC power source for tightness.<span class=\"Apple-converted-space\">\u00a0 <\/span>Ensure that all components are powered on and cables are neat and secure.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">No Problems Noted<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Inspection of through-wall installation<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Check for evidence of precipitation seepage through the wall.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">No Problems Noted<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Inspection of interferometer relative humidity<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Check the relative humidity (RH) paper indicator on the desiccator tube on the left side of the interferometer box.<span class=\"Apple-converted-space\">\u00a0 <\/span>If RH &gt; 20%, the desiccant should be changed (see instructions). A dry nitrogen purge can be run beforehand to dry out the interferometer box. Note: If RH &gt; 30%, the ER-AERI optics (CsI beamsplitter) can get permanently damaged.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">RH &lt; 20%<br \/>\n<\/span><span class=\"s1\">RH &gt; 20% \u2013 Desiccant was changed<br \/>\n<\/span><span class=\"s1\">RH &gt; 20% &#8211; Desiccant was not changed &#8211; See CM Report <\/span><\/p>\n<h3 class=\"p3\"><span class=\"s1\"><b>Functional check of instrument<\/b><\/span><\/h3>\n<p class=\"p4\"><strong><span class=\"s1\">Check of instrument power<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"diff-chunk diff-chunk-equal\">Check that the instrument is powered on. Check that the green LED power indicators are lit on the Parker CompuMotor <\/span><span class=\"diff-chunk diff-chunk-inserted\">(right) <\/span><span class=\"diff-chunk diff-chunk-equal\">and Connect Power DC-DC power <\/span><span class=\"diff-chunk diff-chunk-inserted\">supply (left).<\/span><span class=\"diff-chunk diff-chunk-equal\"> Check that the LINK and ACT LEDs are flashing on the interferometer <\/span><span class=\"diff-chunk diff-chunk-inserted\">box (center).<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">Instrument is Powered On<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Check of displayed date\/time<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Locate the date and time in the lower right corner of the computer display, and the lower right corner of FTSW window.<span class=\"Apple-converted-space\">\u00a0 <\/span>Compare with current SDS date\/time.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">Date and Time are Correct<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Check that the data graphs are displayed<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Look at the \u2018Acquisition\u2019 tab in the FTSW window, and ensure that both Channel A (MCT, blue) and Channel B (InSb, red) are displayed and updating.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">Graphs displayed and appear reasonable<br \/>\n<\/span><span class=\"s1\">Graphs displayed but not updating \u2013 See CM Report<br \/>\n<\/span><span class=\"s1\">No graphs displayed \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Check that ingest is running<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Select the Ingest window.<span class=\"Apple-converted-space\">\u00a0 <\/span>Ensure that data is updating (scrolling).<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist response: <\/span><\/em><\/p>\n<p class=\"p5\" style=\"padding-left: 30px\"><span class=\"s1\">Ingest is running<br \/>\n<\/span><span class=\"s1\">Ingest is not running \u2013 See CM Report<\/span><\/p>\n<p class=\"p4\"><strong><span class=\"s1\">Check that status boxes are all green<\/span><\/strong><\/p>\n<p class=\"p4\"><span class=\"s1\">Look at the \u2018Monitoring\u2019 tab in the FTSW window, or look at <a href=\"http:\/\/webmads.ssec.wisc.edu\/\"><span class=\"s2\">http:\/\/webmads.ssec.wisc.edu\/<\/span><\/a> Ensure that all status boxes are green.<\/span><\/p>\n<p class=\"p4\"><em><span class=\"s1\">Checklist Response: <\/span><\/em><\/p>\n<p class=\"p4\" style=\"padding-left: 30px\"><span class=\"s1\">No Problems Noted<br \/>\n<\/span><span class=\"s1\">Problem \u2013 See CM Report<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Instrument: \u00a0 ER-AERI Starting Date: \u00a0 1 July 2015 Instrument Mentor: \u00a0 Jonathan Gero Facility: \u00a0 NSA-C1, AMF-M2, AMF-M3 PM Frequency: \u00a0 Daily The following procedure is for performing scheduled daily preventative maintenance on the Extended Range (ER) AERI.\u00a0 All results are recorded on the PM checklist. Physical check of instrument Inspection of front-end enclosure [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"parent":22,"menu_order":4103,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-260","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/pages\/260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/comments?post=260"}],"version-history":[{"count":1,"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/pages\/260\/revisions"}],"predecessor-version":[{"id":2119,"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/pages\/260\/revisions\/2119"}],"up":[{"embeddable":true,"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/pages\/22"}],"wp:attachment":[{"href":"https:\/\/www.ssec.wisc.edu\/aeri\/wp-json\/wp\/v2\/media?parent=260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}