PECAN IOP 26

Crew: Olson, A. Wagner, Williams, Loveless

Author: Loveless

Date: 12 July 2015 (UTC)

IOP 26 was conducted by MIPS and MISS back near Hays, KS as a CI/LLJ mission. Rest of the fleet of mobile vehicles traveled during the day, staying the night in Iowa, to be in position for a major MCS on the 12th.