SSEC Home Atmospheric Emitted Radiance Interferometer AERI

  • Home
  • References
  • Contact
  • Knowledge Base

M-AERI Weekly Preventative Maintenance Procedure – SAIL

Instrument: M‑AERI
Starting Date: 1 July 2021
Instrument Mentor: Jonathan Gero
Facility: AMF‑M2
PM Frequency: Weekly


Hardware checks:

Inspection of scene mirror (once a week, or as needed):

  • When the side hatch is open, quickly inspect the scene mirror surface with a flashlight
    • Do not obstruct the instrument field-of-view for more than ~3 seconds!
    • Clean or replace the mirror if necessary (see instructions).
UW Logo
1225 W. Dayton St. · Madison, WI 53706, USA · 608-263-6750